PLASTIC INJECTION MOLDING: ROBUST PROCESS DEVELOPMENT & SCIENTIFIC MOLDING

Plastic Injection Molding : Robust Process
Share:

Course Overview

Scientific Injection Molding is typically used in the production of complex parts and components where small variations in molding variables can severely impact the process or finished product. Therefore, the goal of Scientific Injection Molding is twofold:

  1. Develop a process that produces repeatable results with minimal variation.
  2. Optimize dimensional or mechanical characteristics of a molded part.

When developing a molding process using Scientific Injection Molding, key inputs such as time (fill, pack/hold, etc.), temperature (melt, barrel, etc.), and pressure (hydraulic, injection melt, cavity, etc.) are meticulously monitored, adjusted, and controlled, to ensure that process robustness is achieved, and a good part is consistently produced. A process can be robust or on the other hand must be changed frequently. A robust process ensures repeatability and a wide processing window for better quality & cost. 

Course Objectives

  • Material properties that affect processing
  • The importance of drying
  • Explains specific rules for controlling the plastic during processing
  • Injection molding machine selection
  • Provides thorough overview of injection molding and troubleshooting techniques.
  • Exercise greater control over the molding process
  • Reduce rejects and scrap
  • Improve part quality
  • Increase productivity
  • Robust parameter optimization

Who Should Attend

This 14 hours / 2 days workshop has been designed for all Managers, Section Heads, Engineers and Senior Technicians who are involved in the process of Plastic Injection Molding and want to make their workplace more productive & optimized. Following groups of people will benefit from this training:

  1. Tool makers
  2. Manufacturing engineers
  3. Production engineers
  4. Any technical personnel involved with plastic injection moulded parts

Course Content

DAY 1 (9.00am—5.00pm)

1. Handling Semi Crystalline & Amorphous Polymers

    1. Shrinkage
    2. Mel temperature
    3. Mold filling speed
    4. Mold temperatures
    5. Barrel Heat Profile
    6. Screw recovery speeds
    7. vii. Nozzle temperature
    8. viii. Cooling times
    9. Mechanical properties
    10. Optical clarity

2. Plastic drying

      1. Degradation
      2. Drying time
      3. iii. Drying temperature
      4. Types of dryers
      5. Moisture measurement
      6. Overdrying effect

3. Injection moulding machine selection

    1. Clamp force
    2. Machine platen size
    3. iii. Shot size
    4. Screw diameter
    5. Compression ratio
    6. Types of screws
    7. vii. Check ring importance

DAY 2 (9.00am—5.00pm)

4. Process optimization

    1. Optimization of injection phase
    2. Cavity balance
    3. iii. Pressure drop
    4. Process window
    5. Gate seal time
    6. Cooling time
    7. vii. Screw speed & back pressure

5. Mold qualification flowchart

    1. Mold qualification checklist
    2. Waterline diagrams
    3. iii. Mold temperature maps
    4. Setup instructions

6. Mould cooling, venting & regrind management

    1. Mould cooling
    2. Mould venting
    3. iii. Regrind

7. DOE to develop robust injection molding parameters

8. Troubleshooting common issues at customer location

    1. Short molding – consistent and inconsistent
    2. Flash

Table of Contents

Ways to Send Us an Enquiry:

  1. WhatsApp Us – Get a quick response from our team
  2. Fill in the Program Enquiry Form – Submit your details and requirements
  3. Start a Live Chat – Chat with us instantly via the bottom-left of our website

✅ 100% HRD Corp Claimable — No Upfront Payment Needed

Open to both company-sponsored participants (from HRD Corp–active employers) and individuals.
No minimum participants required — personal registrations are welcome.

Public Program Process:

  1. Contact us to receive the brochure and registration details
  2. Confirm your seat(s) for the scheduled session
  3. (For company-sponsored participants) HR registers on eTRiS at least 7 working days before
  4. (For personal registrations) Invoice will be issued upon confirmation
  5. HRD Corp issues an approval letter — please share it with us before the training
  6. Attend the training as scheduled
  7. We’ll submit the HRD Corp course fee claim after training

Program Enquiry Form

    ORGANIZATION DETAILS






    PERSON-IN-CHARGE DETAILS





    FOR FURTHER INFORMATION, PLEASE CONTACT US!

    Thank you