PREVENTIVE & PREDICTIVE MAINTENANCE FOR MOULDING MACHINES

Disclaimer:
This training topic is currently available for in-house sessions only, with a minimum requirement of 5 participants. Public program sessions are not available at the moment. The public program date will be announced when scheduled.

Share:

LEARNING OBJECTIVE

  • To provide comprehensive knowledge on preventive and predictive maintenance practices 
  • To understand the components and working principles of injection moulding machines 
  • To introduce the basics of hydraulic, pneumatic, and electrical systems in moulding machines 
  • To develop the ability to perform condition-based maintenance 
  • To enhance machine uptime, reduce breakdowns and extend equipment lifespan

 

WHO SHOULD  ATTEND

  • Maintenance Technicians 
  • Production and Process Engineers 
  • Maintenance Planners and Supervisors 
  • Technical Trainers and Facility Engineers

 

TRAINING METHODOLOGY

  • Maintenance checklist templates 
  • Basic hydraulic, pneumatic, and electrical diagrams 
  • Condition monitoring samples 
  • Troubleshooting flowcharts 
  • Certificate of completion

 

COURSE OUTLINE

DAY 1: Machine Fundamentals and Preventive Maintenance

Morning Session: 

1.0 Introduction to Maintenance Management 

  • Definition and importance of preventive & predictive maintenance (PM & PdM) 
  • Reactive vs preventive vs predictive 
  • Benefits: reliability, safety, cost saving

2.0 Types of Moulding Machines 

  • Hydraulic, electric, and hybrid machines 
  • Structure overview: clamping unit, injection unit, control system 
  • Basic machine operation and process flow

3.0 Key Machine Components and Their Functions 

  • Injection unit: screw, barrel, nozzle 
  • Clamping unit: tie bars, platens, toggle or hydraulic mechanism 
  • Hydraulic system: pump, valves, oil circuit 
  • Pneumatic system: air valves, cylinders, regulators 
  • Electrical system: sensors, PLC, HMI, relays, contactors

Afternoon Session: 

4.0 Introduction to Basic Systems 

  • Basic Hydraulics: components, pressure control, fluid properties, schematics 
  • Basic Pneumatics: air flow control, valves, actuators, FRL units 
  • Basic Electrical: power distribution, fuses, overloads, grounding, wiring diagrams

5.0 Preventive Maintenance (PM) Planning 

  • PM scheduling (daily, weekly, monthly, yearly) 
  • Lubrication plan 
  • Filter, hose, and seal inspections 
  • Checklists and documentation

6.0 Practical PM Checks (Workshop or Video Demo) 

  • Oil level and quality check 
  • Heater band and thermocouple testing 
  • Cleanliness and ventilation inspection 
  • Hydraulic leak detection and electrical connection tightening

 

DAY 2: Predictive Maintenance and Monitoring Techniques

Morning Session: 7.0 Introduction to Predictive Maintenance (PdM) 

  • PdM vs PM comparison 
  • Data-driven approach and sensors 
  • Early warning signs detection

8.0 Condition Monitoring Tools 

  • Vibration analysis 
  • Infrared thermography 
  • Ultrasonic testing 
  • Oil analysis and particle count 
  • Real-time monitoring sensors

Afternoon Session: 

9.0 Analyzing Machine Behavior 

  • Monitoring cycle time and part rejection 
  • Motor performance and power usage 
  • Screw torque, back pressure trends

10.0 Integrating PdM with Industry 4.0 

  • Smart sensors and IoT integration 
  • Machine data logging 
  • Alarm-based diagnostics and dashboards

 

DAY 3: Troubleshooting, Safety and Continuous Improvement

Morning Session: 

11.0 Root Cause Analysis in Moulding Machines 

  • Systematic troubleshooting (5 Why, Fishbone diagram) 
  • Common failure modes (hydraulic leaks, overheating, poor clamping) 
  • Case studies and failure investigation

12.0 Safety in Maintenance Activities 

  • Lockout-tagout (LOTO) procedures 
  • Electrical and hydraulic safety precautions 
  • Personal protective equipment (PPE) use

Afternoon Session: 13.0 Maintenance KPIs and Documentation 

  • MTBF, MTTR, OEE basics 
  • Record keeping and trend analysis 
  • Digital vs manual systems

14.0 Final Group Workshop 

  • Simulated machine condition diagnosis 
  • PM & PdM improvement plan presentation 
  • Feedback and Q&A session

How To Submit an Enquiry to Us?

  1. Fill in the form below and submit to us.
  2. Initiate a conversation via live chat on the bottom left of our website by stating: “Hi, my name is [your-name]. I’ve already submitted the form for this training.”
  3. We’ll promptly reach out to you regarding the training you’re interested in.

✅ 100% HRD Corp Claimable — No Upfront Payment Needed

If your company is an active HRD Corp contributor, you pay nothing upfront under the SBL-Khas scheme. Minimum 5 participants for a full in-house claim.

Inhouse Program Process:

  1. WhatsApp or email us — we prepare your training proposal & quotation
  2. Customize the training based on your industry and requirements
  3. Confirm the training outline and schedule
  4. HR registers the course on eTRiS (at least 7 working days before)
  5. HRD Corp issues an approval letter
  6. Attend the training
  7. We’ll submit the HRD Corp course fee claim after training

Program Enquiry Form

    ORGANIZATION DETAILS








    PERSON-IN-CHARGE DETAILS






    FOR FURTHER INFORMATION, PLEASE CONTACT US!

    Thank you